John Metras
Associate VP Facilities
John has over 20 years of experience in facilities development and operations including his previous roles as Managing Director, Infrastructure Development and Director of UBC Plant Operations (now Building Operations).
John has played an integral role in helping UBC evolve into a global leader in sustainability. He has worked on a wide range of initiatives including the Campus as a Living Lab program, the 20-Year Sustainability Strategy, LEED Platinum and LEED Gold certified building projects, and the development of the Brock Commons Tallwood House student residence.
John has a Bachelor of Engineering Science from the University of Western Ontario, a Master of Business Administration from the University of British Columbia, and is a registered Professional Engineer.
Contact information
Campus & Community Planning Building 1
2210 West Mall
Vancouver BC V6T 1Z4
Email: John.Metras@ubc.ca
Leadership vision
“I am an inclusive, action-oriented leader. I engage and empower my team and collaborate with stakeholders to build and maintain a safe, clean, sustainable and inspiring physical environment that has a long-term transformative impact on learning, research and campus life at UBC.”
John Metras
Associate Vice-President, Facilities
Updates related to UBC Facilities
-
Metro Vancouver water crews conducting planned work starting October 16
During the water system adjustments, there will be no interruption to drinking water service. However, you may notice cloudiness or slight discolouration in the water for a few days. Drinking water remains safe for use and consumption at all times.
-
Keep our shared spaces clean and welcoming: Check out the Classroom Usage Guidelines
Classrooms can be used as a study space when classes or other events are not in session. Please give priority to classes and room bookings. Follow the Classroom Usage Guidelines.
-
University Services Building (USB) Lighting Renewal: Exterior work occurring October 6–8
Exterior lighting work is scheduled to begin this Monday, October 6. The west sidewalk on West Mall will be closed to pedestrian traffic. On October 8, work will begin on the north side of USB.