John Metras
Associate VP Facilities
John has over 20 years of experience in facilities development and operations including his previous roles as Managing Director, Infrastructure Development and Director of UBC Plant Operations (now Building Operations).
John has played an integral role in helping UBC evolve into a global leader in sustainability. He has worked on a wide range of initiatives including the Campus as a Living Lab program, the 20-Year Sustainability Strategy, LEED Platinum and LEED Gold certified building projects, and the development of the Brock Commons Tallwood House student residence.
John has a Bachelor of Engineering Science from the University of Western Ontario, a Master of Business Administration from the University of British Columbia, and is a registered Professional Engineer.
Contact information
Campus & Community Planning Building 1
2210 West Mall
Vancouver BC V6T 1Z4
Email: John.Metras@ubc.ca
Leadership vision
“I am an inclusive, action-oriented leader. I engage and empower my team and collaborate with stakeholders to build and maintain a safe, clean, sustainable and inspiring physical environment that has a long-term transformative impact on learning, research and campus life at UBC.”
John Metras
Associate Vice-President, Facilities
Updates related to UBC Facilities
-
Meet UBC’s new cogeneration engine
UBC’s replacement cogeneration engine, the Jenbacher J-612 arrived in its new home inside the Bioenergy Research Demonstration Facility (BRDF) engine room on April 6, 2023, and is being commissioned for operation in May 2023.
-
UBC Facilities supports student team in the construction of a unique building
Last week, UBC started to unveil a vibrant new teaching and learning space that is one of Canada’s first institutional spaces designed to be near-zero embodied carbon. The project and student team were well supported by contributions from UBC Facilities’…
-
Upcoming road closures on UBC Vancouver campus as of March 17, 2023
The following road closures are expected around the UBC Vancouver campus as of March 17, 2023. Thank you for your patience and cooperation.